guides
Last update:02 December 2016
Here’s your chance to build the fastest railroad in Europe!
This mission will require you to rely on passenger trains and buses.
The problem is that the mission (as was the previous one) is acting like “broken”.
On my version of the game, e.g.
build 11807, it will be very hard to get past one of the objectives.
Reduce travel timeto less than 7 minutes.
Before you attempt to break the first speed record, reorganize the route.
The existing tracks don’t show maximum achievable speed.
Keep the tracks simple and straight, build tunnels if you must.
Now buy an engine, the one for 16 million(2).
Let it run a round trip on the new route once.
This will complete the objective and unlock buses.
Sell the train and replace it with one resting in the depot, adding five cars.
Passenger transport.500 passengers within a year.
Now’s the difficult part.
Now add the stations and design a bus and tram data pipe.
Some of the passengers will surely praise your thoughtfulness.
Furthermore, establish a cargo route with the city: send goods to Paris and machines to Lyon.
For this objective, the game counts passengers that are getting off the trains.
The task should be completed no later that around June.
The best way to win is to upgrade your trains to TGV-class - ultra fast railway.
This will also multiply your profits thanks to increased train frequency.
As a reward, you’ll be given improved TGV.
This site is not associated with and/or endorsed by the Gambitious Digital Entertainment or Urban Games.
All logos and images are copyrighted by their respective owners.